Differences
This shows you the differences between two versions of the page.
blog:suturodemonstration [2014/02/27 08:27] – created winkler | blog:suturodemonstration [2014/02/27 08:29] (current) – winkler | ||
---|---|---|---|
Line 16: | Line 16: | ||
CRAM is being used in this project to manage high level planning and execution tasks, and to connect the abstract high level plans to actual robot control mechanisms. | CRAM is being used in this project to manage high level planning and execution tasks, and to connect the abstract high level plans to actual robot control mechanisms. | ||
+ | |||
+ | {{tag> |