Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
blog:our_paper_on_cram_has_been_accepted_to_icra_2021 [2022/06/01 10:21] – [Our paper on CRAM has been accepted to ICRA 2021] gkazhoyablog:our_paper_on_cram_has_been_accepted_to_icra_2021 [2022/06/16 14:57] (current) – [CRAM @ ICRA 2021] gkazhoya
Line 1: Line 1:
-====== Our paper on CRAM has been accepted to ICRA 2021 ====== +====== CRAM ICRA 2021 ======
 <html><div style="float:right; margin-left:10px;"><iframe width="448" height="252" src="https://www.youtube.com/embed/pv_n9FQRoZQ" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe> <html><div style="float:right; margin-left:10px;"><iframe width="448" height="252" src="https://www.youtube.com/embed/pv_n9FQRoZQ" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>
 </div></html> </div></html>
Line 8: Line 7:
  
 CRAM takes care of action planning, parametrization and execution in the system, including failure handling. CRAM takes care of action planning, parametrization and execution in the system, including failure handling.
-It also integrates all the system components together,+It also integrates all the system components together.
  
 You can access the paper [[https://ieeexplore.ieee.org/document/9560774|here]]. You can access the paper [[https://ieeexplore.ieee.org/document/9560774|here]].